Central plant staging & reset
Slide the building cooling load and watch chillers stage on, chilled-water supply temperature reset up at part-load, and the distribution pumps ride down on differential-pressure reset — with plant energy tracking it all.

Interactive central plant lab: cooling load stages chillers and drives chilled-water temperature reset and pump differential-pressure reset.

45%
Chillers online
2 / 3
CHW supply setpoint
47 °F
Pump speed (ΔP reset)
60%
Relative plant energy
45%