BAS-107 Evidence Workbook
Professional evidence workbook
Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.
Units, conversions and reasonableness
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Drawing scale, geometry and quantities
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Transformer and voltage-drop calculations
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Signal scaling and calibration error
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Airflow/hydronic heat calculations
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Network, trend and tolerance analysis
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Mixed RTU/VAV calculation-package capstone
Required artifact: Givens/source; diagram; units; equation; substitutions; result; estimate; tolerance; limitations; changed case; error audit and professional interpretation.
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |