BAS-205 Evidence Workbook

Professional evidence workbook

Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.

205-L1 · Topology builder

Layered network/riser map

Required artifact: Media; identities; owners; interfaces; dependencies

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
205-L2 · RS-485 lab

MS/TP physical segment

Required artifact: Cable/topology/polarity/reference/shield/termination

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
205-L3 · Token replay

MS/TP address and timing diagnosis

Required artifact: MAC/baud/device/network; latency/errors; next test

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
205-L4 · Wiremap/link case

Ethernet termination and port handoff

Required artifact: Media; pinout; path; label; test limitations

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
205-L5 · Address worksheet

IP/VLAN/gateway assignment

Required artifact: Assigned values; subnet; owner; required flows; conflicts

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
205-L6 · Isolated Neeve-style session simulation

Remote changed-case diagnosis

Required artifact: Named access; read-only baseline; test; log; logout/restore

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
205-C · Independent defense

Mixed BACnet network package

Required artifact: Riser; addresses; baselines; faults; corrections; as-built; OJL

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense