BAS-304 Evidence Workbook
Professional evidence workbook
Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.
Fan/filter/duct static-pressure story
Required artifact: pressure profile, airflow/current evidence, restriction/fan branches
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Economizer and mixed-air plausibility
Required artifact: OA/RA/MA calculations, damper/proof, freeze/latent considerations
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
DX cooling and heat-pump symptom separation
Required artifact: air/refrigerant-accessible evidence, staging, defrost/protection, escalation
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Coil/valve/flow/ΔT diagnosis
Required artifact: air/water temperatures, valve/DP/flow evidence, capacity reasonableness
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Pump/plant interaction and low-ΔT case
Required artifact: load-flow-temperature trace and alternative causes
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Controls versus mechanical versus balance versus design
Required artifact: classification, responsible role, next safe test
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Rotating multi-system service stations
Required artifact: fault isolation, correction route, verification and service record
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |