BAS-407 Evidence Workbook
Professional evidence workbook
Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.
Commissioning readiness review
Required artifact: Current sources; roles; hazards; TAB/calibration/readiness; test window; backup; abort/restore; go/no-go
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Point-to-point checkout
Required artifact: Identity; units/range/polarity; command/effective output; feedback/proof; graphic/trend; defect record
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Priority, override, and release audit
Required artifact: Every active source; local/manual states; expected process response; explicit release; zero unowned states
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Loop disturbance and acceptance test
Required artifact: Baseline; prediction; error/overshoot/settling/saturation; mechanical contradiction; changed case; restore
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Mode, safety, failure, and restart test
Required artifact: Entry/exit; proof loss; sensor/network failure; fallback; alarm; power recovery; time to safe state
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Issue, correction, retest, and turnover
Required artifact: Reproducible issue; owner; correction; regression; witness; acceptance; versions/backups/training; open risks
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |
Changed-case AHU/VAV commissioning day
Required artifact: Readiness through turnover; raw evidence; issues/retests; temporary-state reconciliation; acceptance recommendation
| Identity, source, mode, authority | |
|---|---|
| Hazards, impacts, prohibited actions, stop criteria | |
| Expected normal and acceptance basis | |
| As-found evidence and timestamps | |
| Calculations with units and reasonableness | |
| Hypotheses, contradictions, discriminating test | |
| Action, expected result, abort/rollback | |
| Result, changed case, restoration, as-left | |
| Open risk, owner, due date, defense |