Technical Trade SchoolBAS-500 platform-specialization
BAS-504
Editable professional record

BAS-504 Evidence Workbook

Professional evidence workbook

Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.

504-L1 · Architecture decision case

Honeywell ecosystem and controller-path selection

Required artifact: Model/tool/bus/application path; point/resources; support; lifecycle; selected route

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
504-L2 · Function-block/HMI simulator

Optimizer I/O, HOA, and IRM logic

Required artifact: Types/units; authority sources; logic; timing; normal/fault/restart; complete release

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
504-L3 · Wizard/function-block comparison lab

Spyder/Stryker terminal application

Required artifact: Fixed/configurable/programmed boundary; Sylk; airflow; modes; archive/live proof

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
504-L4 · BACnet/MS/TP/Panel Bus/Sylk case

Mixed-bus and BACnet commissioning

Required artifact: Identity/topology; device limits; updates; scaling; faults; as-built evidence

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
504-L5 · Database/graphic/services lab

WEBs supervision and operator evidence

Required artifact: Bindings; status/freshness; command/proof; alarms/trends/schedules; permissions

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
504-L6 · Lifecycle/recovery tabletop plus simulator

Hardening, migration, backup, and restore

Required artifact: Accounts/certs; compatibility; artifacts; RPO/RTO; functional proof; open risk

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
504-C · Independent application and defense

Mixed Honeywell controller project

Required artifact: Optimizer plus installed terminal path; integration; tests; recovery; turnover

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense