This is the concept-review layer for a 100% online course. Read each module before its lesson, complete the retrieval prompts without looking, then use the linked authoritative sources to verify project-specific editions, requirements, and manufacturer procedures.

Online evidence is not OJL: browser simulations, document cases, and isolated remote equipment build reasoning and documentation skill; supervised field performance is recorded separately.

Module 1

Controlled lab baseline, source/live truth and recovery

Why it matters: Procedure accuracy is version and controller specific; a source file is not proven deployed truth until compared and tested.

Vocabulary and working scope

CXproHD version; controller family/model; firmware; license; libraries/ProPack; connection; project/source copy; deployed copy; checksum/version; backup; reset; authority; stop.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

The provided .CXB opens with missing libraries and the live controller differs from the handoff version.

Calculation: Reconcile required/actual versions and dependencies; calculate coverage, age, checksum matches, and recovery time.

Retrieval prompts

Module 2

Cylon architecture, controller families and project structure

Why it matters: Product-family similarity does not prove capacity, I/O, firmware, or feature equivalence; exact data controls.

Vocabulary and working scope

Site; network; controller; strategy; FLX/CB/FB awareness; I/O expansion; BACnet identities; capacity; licensing; INTEGRA relationship; application fit.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A template developed for one controller family exceeds available points and memory on another target.

Calculation: Calculate point/capacity utilization, expansion requirements, network counts, spare margin, and unsupported features.

Retrieval prompts

Module 3

Mixed I/O, UniPut, BACnet objects, scaling and proof

Why it matters: I/O configuration, object value, strategy value, and physical process are related but independent evidence layers.

Vocabulary and working scope

AI/AO/BI/BO/UniPut; signal type/range; units; calibration; normal/fail state; BACnet object; priority; command; feedback; physical proof; safeties.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A universal input reads plausibly while configured for the wrong thermistor curve; an output object changes without actuator travel.

Calculation: Calculate linear scaling, sensor error, command/proof error, timeout, and state-table coverage.

Retrieval prompts

Module 4

Blocks, data types, execution, timing and readable strategy

Why it matters: A strategy that appears to work in one steady state may fail on startup, type conversion, race/timing, or retained state.

Vocabulary and working scope

Block contracts; Boolean/analog/enumerated values; execution order; scan/update timing; retained state; initialization; naming; comments; modules/macros; dead code; diagnostics.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A latch remains true after restart and a numeric block silently interprets an enumerated state.

Calculation: Calculate scan versus process timing, timer behavior, type/range limits, block utilization, and test coverage.

Retrieval prompts

Module 5

Requirement decomposition, states, permissives, PID and restart

Why it matters: Every transition needs trigger, prerequisites, action, proof, timeout/fault response, recovery, and restart behavior.

Vocabulary and working scope

Sequence clauses; mode/state tables; enable/permissive/interlock/safety; setpoint/reset; PID; deadband; hysteresis; staging; anti-cycle; fallback; restart; manual/auto.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A lead pump starts from schedule but restarts after a power interruption without proof or anti-cycle delay.

Calculation: Calculate reset slope, PID error/output limits, deadband, stage thresholds, minimum on/off time, and transition coverage.

Retrieval prompts

Module 6

Terminal, VAV, VVT and fan-coil applications

Why it matters: Application templates require a verified equipment and sensor contract; VAV, pressure-dependent VVT, and measured-airflow hybrid VVT are not interchangeable.

Vocabulary and working scope

Zone demand; occupancy; airflow/pressure; damper; reheat; fan; condensation/freeze; ventilation; single-source VVT; measured-airflow hybrid; limits; local/network fallback.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A hybrid VVT box uses a crossflow pickup but the strategy applies VAV minimums without verifying central-unit mode or pressure reference.

Calculation: Calculate airflow from supplied DP relationship, zone demand, minimum/maximum limits, heating/cooling transitions, and changed-case coverage.

Retrieval prompts

Module 7

AHU and plant applications with safeties and staging

Why it matters: Supervisory logic must not replace listed/hardwired safeties, and a commanded state is not equipment or process proof.

Vocabulary and working scope

AHU modes; fans/proof; dampers/valves; economizer; SAT/static reset; coils; freeze/smoke boundaries; pumps; lead/lag; boilers/chillers; staging; failure/restart.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

An AHU fan command is on while proof is false and static pressure rises because isolation dampers remain closed.

Calculation: Calculate reset, PID/staging thresholds, proof timeout, load/temperature relationships, runtime balance, and recovery sequence.

Retrieval prompts

Module 8

BACnet/IP, MS/TP, FLX identity, routing and load

Why it matters: One online indication is insufficient; identity, topology, error counters, timing, service acceptance, and application freshness must agree.

Vocabulary and working scope

IP/device/network/MAC identity; topology; baud; Max_Master; routing; BBMD awareness; object exposure; polling/COV; FLX expansion; duplicate identity; diagnostics.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

Objects read locally but not from INTEGRA after a network-number conflict and polling increase.

Calculation: Calculate subnet/identity inventory, token/update time, poll/COV load, error rate, and capacity margin.

Retrieval prompts

Module 9

Download, upload, compare, watch, debug and rollback

Why it matters: A successful download is not acceptance; correct target, deployed artifact, function, failure, restart, rollback, and restoration must be proven.

Vocabulary and working scope

Target verification; source/deployed compare; backup; compile/validation; download scope; impact; watch values; forced/test states; audit; fault injection; abort; rollback; restart; clean state.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A mass download reaches 14 of 16 controllers and leaves two with mismatched versions and one test override.

Calculation: Calculate completion/exception rate, version/checksum coverage, deployment duration, rollback time, and temporary-state closure.

Retrieval prompts

Module 10

INTEGRA, graphics, alarms, trends, schedules and operator truth; Point-to-point, functional commissioning, recovery and handoff

Why it matters: A polished supervisor page is unsafe if identity, status, stale/override/fault state, authority, accepted command, physical proof, or denial is hidden. Commissioning closes only when field/object/logic/process evidence, exception handling, restart, recovery, records, and temporary-state reconciliation pass.

Vocabulary and working scope

Supervisor integration; point import; names/units/status; graphics; commands; alarms; trends; schedules; users/roles; time; history; operator workflow; latency; audit. Readiness; point tests; normal/boundary/failure/restart; issue/retest; regression; backup; .CXB; version manifest; recovery; as-built; operator handoff; defense.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A graphic command appears accepted for an unauthorized role while the controller rejects it and the trend timestamp is stale. Changed-capstone condition: Steady-state tests pass, but failed-sensor fallback and backup restore were never exercised.

Calculation: Calculate command/proof timing, sample/storage needs, stale thresholds, alarm delay, role-test coverage, and task success. Calculate test and requirement coverage, defects/retest, restore time, version reconciliation, temporary-state closure, and residual risk.

Retrieval prompts

Required and deeper reading

Adoption note: Standards, codes, project requirements, owner criteria, manufacturer instructions, and employer safety programs control. Confirm the adopted edition and authority before applying a numeric requirement.