BOOT-OT Reading Guide

How to use this reading guide

This is the concept-review layer for a 100% online course. Read each module before its lesson, complete the retrieval prompts without looking, then use the linked authoritative sources to verify project-specific editions, requirements, and manufacturer procedures.

Online evidence is not OJL: browser simulations, document cases, and isolated remote equipment build reasoning and documentation skill; supervised field performance is recorded separately.

Module 1

OT mission, consequences, governance, scope and lab ethics

Why it matters: OT security serves safe reliable operation; technical curiosity, tool capability, or an alert does not create authority.

Vocabulary and working scope

Building mission; comfort/process/safety/energy; availability/integrity/confidentiality; roles; owner; authority; rules of engagement; scope; consequence; communication; stop; evidence handling.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A suspected controller compromise is reported during extreme weather, but ownership and shutdown consequences are unclear.

Calculation: Calculate qualitative/quantitative risk from supplied criteria, scope coverage, decision windows, and consequence-weighted priorities.

Retrieval prompts

Module 2

Asset, software, data and dependency inventory

Why it matters: An IP scan alone cannot establish a safe OT inventory; passive evidence, project records, platform data, owner confirmation, and functional dependencies must reconcile.

Vocabulary and working scope

Device/host/network/service/software/firmware/license; identity; owner; location; role; criticality; exposure; communication peers; data; backup; support; lifecycle; hidden dependencies.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A supervisor replacement fails because certificate, license, DNS, history, and third-party integration dependencies were absent from inventory.

Calculation: Calculate inventory coverage/confidence, unsupported assets, ownership gaps, dependency coverage, and backup readiness.

Retrieval prompts

Module 3

Current/future architecture, zones, conduits and blast radius

Why it matters: Segmentation is a risk and consequence design, not merely more VLANs; required operations and recovery paths must remain explicit.

Vocabulary and working scope

Enterprise/DMZ/OT/control zones; VLAN/subnet; routing/firewall; wireless/remote; management plane; trust; required conduits; physical process; redundancy; single points; migration.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A flat BAS network includes workstations, JACEs, controllers, vendor access, and historian traffic with no documented trust boundary.

Calculation: Calculate subnet plans, asset/flow counts by zone, single-point and blast-radius measures, migration stages, and rollback points.

Retrieval prompts

Module 4

Identity, RBAC, service accounts, certificates and secure remote access

Why it matters: Remote connectivity is not standing permission; shared accounts and indefinite broad access defeat attribution and containment.

Vocabulary and working scope

Named users; roles; least privilege; service accounts; MFA where supported; certificate identity/lifecycle; joiner/mover/leaver; vaulting; Neeve session; target/action/time; approval; logging; revocation.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A vendor needs two-hour read-only access to one training JACE, but the current method uses a shared admin account and open VPN.

Calculation: Calculate entitlement coverage, privileged/shared accounts, session duration/expiry, revocation time, certificate renewal window, and audit completeness.

Retrieval prompts

Module 5

Supported hardening and operational validation

Why it matters: A checklist is not acceptance; hardening must be supported, authorized, operationally tested, documented, and recoverable.

Vocabulary and working scope

Controllers; supervisors; switches; firewalls; workstations; services/ports; defaults; users; certificates; secure protocols; patch/version; application allowlisting awareness; time/logging; compensating controls; vendor support.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A disabled legacy service closes exposure but breaks graphics and alarm delivery after restart.

Calculation: Calculate baseline/compliant/exception coverage, required-function pass rate, residual exposure, change/rollback time, and monitoring window.

Retrieval prompts

Module 6

Required-flow rules, routing, NAT, broadcasts and application proof

Why it matters: Port reachability is not application success, and a broad allow is not an acceptable substitute for understanding BACnet and vendor flows.

Vocabulary and working scope

Source/destination; protocol/port; direction; purpose; owner; schedule; expiry; route; NAT; broadcast; BACnet BBMD/FDR/SC; stateful behavior; deny logging; application acceptance.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

Ping passes across a firewall but routed BACnet discovery and certificate validation fail; a temporary any-any rule remains.

Calculation: Calculate subnet/routing decisions, rule coverage/redundancy/shadowing from supplied data, allow/deny tests, latency, and temporary-rule closure.

Retrieval prompts

Module 7

Monitoring, baselines, time, logs and useful alerts

Why it matters: More logs and alerts do not guarantee detection; time quality, context, ownership, retention, tuning, and response path determine usefulness.

Vocabulary and working scope

Network/device/platform/controller logs; flows; alarms; authentication; configuration change; clock/NTP; retention; baseline; threshold; alert owner; triage context; evidence preservation; privacy.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

Repeated authentication failures coincide with a maintenance window, but one controller time source is 18 minutes wrong.

Calculation: Calculate clock skew, baseline ranges, event/alert rates, false-positive ratio, retention/storage, and detection/escalation time.

Retrieval prompts

Module 8

Incident command, evidence, containment and operational recovery

Why it matters: Fast containment is valuable only when authority, physical consequences, dependencies, evidence, reversibility, and recovery are considered.

Vocabulary and working scope

Detection; validation; incident roles; severity; physical impact; communications; evidence; containment options; reversibility; eradication/rebuild; recovery criteria; monitoring; lessons; legal/privacy coordination.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A compromised workstation communicates with a JACE serving critical space; disconnecting the JACE would remove operator visibility and schedules.

Calculation: Calculate severity from supplied rubric, affected assets/dependencies, containment blast radius, decision/recovery timeline, and evidence coverage.

Retrieval prompts

Module 9

Backup scope, protected copies, checksums, RPO/RTO and restore proof

Why it matters: A backup file is not recovery evidence; integrity, completeness, access, dependencies, supported restore procedure, and functional tests must pass.

Vocabulary and working scope

Platform/station/controller/switch/firewall/config/database/certificates/licenses/histories/docs; dependency order; offline/immutable awareness; encryption/access; checksum; RPO; RTO; clean environment; restore; functional proof.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

The station backup starts, but certificates, switch configuration, controller database, and alarm recipients are missing.

Calculation: Calculate backup age versus RPO, restore time versus RTO, dependency and function coverage, checksum results, and residual gaps.

Retrieval prompts

Module 10

Staged migration, exception governance and continuous improvement; Architecture/change capstone, restore exercise and defense

Why it matters: A target architecture without sequencing, ownership, acceptance, rollback, and exception expiry is not an executable security plan. Security acceptance is operational: required flows, physical sequences, operator tasks, incident decisions, and recoverability must all be proven.

Vocabulary and working scope

Current/future gap; priority; compensating controls; maintenance windows; pilot; stop thresholds; dependencies; vendor/owner; exception rationale/expiry; metrics; exercise; lessons; roadmap. Scope; inventory; flows; zones; identity; hardening; monitoring; incident; backup/restore; physical sequence; operator task; migration; rollback; as-left; evidence; residual risk.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

The owner approves segmentation but cannot replace three unsupported controllers this year. Changed-capstone condition: The proposed architecture passes network tests but fails a plant restart sequence and remote-session revocation during an incident.

Calculation: Calculate risk-reduction priority, stage coverage, budget/schedule assumptions, exception age/expiry, pilot success, and rollback points. Calculate requirement/test coverage, allow/deny/function pass rates, RPO/RTO, incident/recovery timing, issue closure, residual risk, and ownership completeness.

Retrieval prompts

Required and deeper reading

Adoption note: Standards, codes, project requirements, owner criteria, manufacturer instructions, and employer safety programs control. Confirm the adopted edition and authority before applying a numeric requirement.