Technical Trade SchoolBAS-200 installer-series
BAS-202
Editable professional record

BAS-202 Evidence Workbook

Professional evidence workbook

Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.

202-L1 · Route decision board

Pathway authority and material selection

Required artifact: Sources; environment; family/fittings; unresolved coordination

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
202-L2 · Bender-mark simulator

Stub and back-to-back 90 layout

Required artifact: Tool data; take-up; marks; gain/check

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
202-L3 · Geometry worksheet

Offset with multiplier and shrink

Required artifact: Rise/angle/spacing/shrink/landing/change case

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
202-L4 · Interactive obstacle case

Kick, saddle, and rolling offset

Required artifact: Geometry; orientation; total bend; reasonableness

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
202-L5 · Defect inspection

Boxes, supports, entries, and penetrations

Required artifact: Source criteria; findings; correction; reinspection

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
202-L6 · Calculation/pull simulation

Fill and pull plan

Required artifact: Areas; criterion; percent; total bend; roles; stop

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
202-C · Independent layout defense

Protected RTU/VAV pathway

Required artifact: Route; bends; boxes/supports; fill; penetrations; redline; OJL

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense