Technical Trade SchoolBAS-200 installer-series
BAS-203
Editable professional record

BAS-203 Evidence Workbook

Professional evidence workbook

Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.

203-L1 · Document/role matrix

Panel work-package trace

Required artifact: Location/power/network/structural interfaces and owners

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
203-L2 · Candidate-site inspection

Environment and mounting location

Required artifact: Ratings; access; hazards; clearances; decision

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
203-L3 · Scaled panel/site worksheet

Mounting and entry layout

Required artifact: Supports; entries; segregation; service; dimensions

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
203-L4 · Calculation case

Power budget and interface

Required artifact: VA/current/spare/drop; source/protection boundaries

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
203-L5 · Panel-path simulator

Controller/relay/network point trace

Required artifact: I/O; RIB/control circuit; proof; references; surge

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
203-L6 · Hold/release scenario

Pre-energization inspection

Required artifact: Checklist; expected state; critical holds; abort/rollback

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
203-C · Independent defense

Controller-panel installation package

Required artifact: Location through startup handoff; defects; records; OJL

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense