BAS-208 Evidence Workbook

Professional evidence workbook

Complete this while working the corresponding online lab. Entries save only in this browser until exported or printed. Do not enter live credentials, protected customer information, or uncontrolled personal data.

208-L1 · Panel document lab

Schematic/BOM/terminal trace

Required artifact: Components; contacts; wires; zones; conflicts

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
208-L2 · Panel layout simulator

Scaled layout and serviceability

Required artifact: Footprints; wireways; clearances; heat; spare

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
208-L3 · Calculation workbook

Control-power budget

Required artifact: VA/current/demand/spare/drop/protection assumptions

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
208-L4 · Connection-classification lab

Ground/bond/common/reference/shield paths

Required artifact: Distinct paths; supplied design; defects; evidence

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
208-L5 · Exposure-path case

Surge/entrance coordination

Required artifact: Power/data paths; SPD location/rating/lead; maintenance

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
208-L6 · Defect/hold simulator

Fabrication and pre-energization inspection

Required artifact: Parts; metal/chips; terminals/torque; tests; critical holds

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense
208-C · Independent design defense

Small DDC panel package

Required artifact: Layout; power; reference; surge; inspection; as-built; OJL

Identity, source, mode, authority
Hazards, impacts, prohibited actions, stop criteria
Expected normal and acceptance basis
As-found evidence and timestamps
Calculations with units and reasonableness
Hypotheses, contradictions, discriminating test
Action, expected result, abort/rollback
Result, changed case, restoration, as-left
Open risk, owner, due date, defense