This is the concept-review layer for a 100% online course. Read each module before its lesson, complete the retrieval prompts without looking, then use the linked authoritative sources to verify project-specific editions, requirements, and manufacturer procedures.

Online evidence is not OJL: browser simulations, document cases, and isolated remote equipment build reasoning and documentation skill; supervised field performance is recorded separately.

Module 1

ABB Cylon ecosystem and engineering architecture

Why it matters: ABB Cylon is a family of related but distinct products; exact model, firmware, tool, module, license, and project architecture control the workflow.

Vocabulary and working scope

CXproHD; site; network; controller; strategy; CB family; FB family; CBXi/FBXi; CBV/FBV; CBT; FLX; INTEGRA; BuildingPro; INTEGRA-ProPack; Niagara supervision.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A site has CBV terminals, an FBXi plant controller, FLX I/O, and an INTEGRA supervisor, but the learner cannot identify which project contains the source strategy.

Calculation: Count devices, networks, strategies, I/O, supervisory dependencies, licenses, and unresolved sources of truth.

Retrieval prompts

Module 2

Controller-family and hardware selection

Why it matters: A controller that fits physically may still fail the application because of I/O mode, resource, firmware, bus, program, licensing, or lifecycle limits.

Vocabulary and working scope

CBM; CBT; CBV; CBR; CBXi; FBXi; FBVi; UniPut; FLX; I/O count/type; power; communications; memory/resource; firmware; replacement; lifecycle.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A proposed replacement has the right enclosure footprint but insufficient UniPut modes and a different supported firmware path.

Calculation: Reconcile I/O by type, UniPut modes, expansion capacity, program/resource load, network limits, spare capacity, and lifecycle risk.

Retrieval prompts

Module 3

CXproHD site, network, controller, strategy, and version model

Why it matters: Saved project, open strategy, live controller, exported archive, and supervisor database can disagree; source-of-truth must be established, not assumed.

Vocabulary and working scope

Project/site; network; device; strategy; address; database; upload/download; firmware; tool version; license; source/live state; archive; compare; revision.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A strategy opens under v1.07.06, but the controller firmware and archived .CXB reflect a prior commissioning revision.

Calculation: Compare versions, checksums where available, timestamps, device/strategy counts, missing dependencies, and change coverage.

Retrieval prompts

Module 4

Strategy blocks, data types, execution, and readable logic

Why it matters: Block connections do not explain intent; types, units, initialization, execution order, timing, priority, failure, comments, and test vectors must be explicit.

Vocabulary and working scope

Boolean; numeric; enum; variable; constant; function block; link; execution order; timer; latch; selector; PID; state; retained value; naming; comments; revision; reusable macro.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A fan strategy restarts latched on and a timer output reaches a dependent block one execution cycle later than expected.

Calculation: Build truth/state tables, trace several cycles, calculate timing and analog math, and compare predicted with observed strategy values.

Retrieval prompts

Module 5

I/O, UniPut, scaling, BACnet priority, and safe failure

Why it matters: UniPut flexibility requires exact mode and electrical verification; a plausible strategy value can still be the wrong signal, priority, or physical state.

Vocabulary and working scope

AI/AO/BI/BO/UI/UO; UniPut mode; voltage/current/resistance; pulse; units; calibration; object; priority; relinquish; quality; fallback; fail state; command; proof.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

An output is configured for the wrong electrical mode while BACnet priority 8 masks the strategy command.

Calculation: Calculate scaling endpoints/midpoint, current/voltage plausibility, effective priority, deviation, proof timeout, and fallback result.

Retrieval prompts

Module 6

Terminal and fan-coil strategy centerpiece

Why it matters: Terminal logic must match the actual physical coil, valve, fan, airflow, sensor, changeover, and safety arrangement; a stock example is only a starting hypothesis.

Vocabulary and working scope

CBV/FBV; fan coil; VAV/VVT awareness; occupancy; zone temperature; airflow; fan speeds; valve/damper; reheat; condensate/window/contact; frost; deadband; changeover; alarms.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A four-pipe fan coil has three fan speeds, a window contact, condensate alarm, and valves that must not overlap under changeover faults.

Calculation: Calculate deadbands, airflow/temperature scaling, fan thresholds, valve timing, occupancy delays, and changed-case acceptance.

Retrieval prompts

Module 7

AHU, plant, VAV, staging, and coordinated applications

Why it matters: Coordination logic cannot hide mechanical design constraints or listed safeties; every request and effective command requires source, limits, proof, fallback, and ownership.

Vocabulary and working scope

AHU; RTU; VAV; hybrid VVT; pumps; boilers; chillers; lead/lag; staging; minimum flow; reset; trim/respond; safeties; proofs; failure substitution.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

Two pumps alternate weekly, but one fails proof during low-load operation and minimum-flow protection must survive lead substitution.

Calculation: Calculate staging thresholds, run-hour rotation, minimum on/off time, flow/reset values, request persistence, and proof-response limits.

Retrieval prompts

Module 8

BACnet/IP, MS/TP, FLX, routing, and addressing

Why it matters: Discovery is incomplete evidence; exact identity, path, electrical topology, object semantics, timing/load, command authority, and process result must agree.

Vocabulary and working scope

Device instance; network number; IP/subnet/gateway; MS/TP MAC/baud; topology; FLX bus; router; discovery; duplicate; object list; polling/COV; PICS; writable behavior.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A controller is visible through two routes, an MS/TP MAC is duplicated, and FLX I/O appears but updates intermittently.

Calculation: Reconcile all identities, segment/device load, token/poll timing, latency, error counts, object coverage, and physical response.

Retrieval prompts

Module 9

INTEGRA, BuildingPro, graphics, alarms, trends, and tuning

Why it matters: Supervisory objects and ProPack components accelerate engineering but require exact version support, state testing, performance baseline, and physical/process validation.

Vocabulary and working scope

INTEGRA; BuildingPro; ProPack; Niagara station; driver; points; graphics; alarms; histories; schedules; users; tuning; command/proof; stale/null; audit.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A ProPack component reports normal while its source point is stale, and a tuning change improves discovery but overloads an older field network.

Calculation: Measure point/binding coverage, history sampling, alarm delivery, schedule precedence, poll/write load, latency, and resource margin.

Retrieval prompts

Module 10

Download, debug, firmware, .CXB backup, recovery, and turnover

Why it matters: A project archive is not a proven recovery asset until restored on a compatible isolated target and critical I/O, strategies, networks, supervisory services, users, and operator tasks pass.

Vocabulary and working scope

Baseline; strategy upload/download; compare; online values; fault injection; firmware; archive; .CXB; clean restore; point-to-point; functional test; issue/retest; as-built; training.

Source-to-result trace

  1. Locate the controlling requirement and establish authority.
  2. Identify the physical and digital boundaries.
  3. Preserve as-found state and timestamps.
  4. Trace the initiating condition through logic, interfaces, equipment, and process response.
  5. Compare expected and actual evidence.
  6. Calculate with units and stated tolerance.
  7. Record action, result, restoration, uncertainty, and owner.

Worked thinking prompt

A firmware change succeeds but one strategy differs from source and two temporary priorities remain after testing.

Calculation: Reconcile planned/applied/retested items, compare versions/artifacts, calculate RPO/RTO and pass rate, and account for every temporary state and open risk.

Retrieval prompts

Required and deeper reading

Adoption note: Standards, codes, project requirements, owner criteria, manufacturer instructions, and employer safety programs control. Confirm the adopted edition and authority before applying a numeric requirement.